Free roster calculators and tools for Australian crews
A roster calculator turns a shift or swing pattern into numbers you can plan with: on and off dates, days at home a year, daily hours on a 9-day fortnight, the headcount for a 24/7 roster, and whether 14 days of shifts sit inside your fatigue limits. All twelve tools are free and run in your browser.
The cost calculators put real numbers on no-shows, turnover, timesheets and payroll leakage, the safety tools turn injury counts into TRIFR and LTIFR and plan a season of toolbox talks, and the business case builder adds it all up. Nothing to install.
Roster planning
Check the roster you have, work out the crew you need, and set the hours and days off for a 9-day fortnight.
Fatigue hours checker
Enter up to 14 days of shifts and check them against common fatigue policy limits, the same style of check a fatigue gate runs before a shift is booked. Adjust the policy numbers to match your own rules.
Policy limits
Shifts (leave days blank for days off)
General guidance only, based on the limits you enter, not legal advice. NHVR standard/BFM hours and some awards use additional counting rules; check the NHVR and Safe Work Australia for the rules that apply to you. In Humanz these checks run automatically on every booking.
24/7 crew coverage planner
How many people does it take to keep a site, plant or depot covered? Enter the coverage you need and see the headcount, crews and average hours that fall out, before you promise a client anything.
672h
Person-hours to cover each week
4
Crews on rotation (3.5 shifts each per week)
16
Minimum headcount (avg 42h/week each)
19
Recommended headcount incl. leave cover
Assumes hours are shared evenly across the rotation. Turning the numbers into an actual working pattern is what rostering software does, see how auto-rostering fills a roster.
9-day fortnight calculator and RDO accrual
A 9-day fortnight fits a fortnight of ordinary hours into nine working days, so the tenth weekday becomes a rostered day off. On a 38-hour week that is 76 hours over nine days, about 8 hours 27 minutes a day. Enter your weekly hours, the first day of the cycle and the weekday you take off to see your daily hours, the time banked towards each day off and the dates of the next twelve. The 19-day month works the same way over four weeks: 152 hours over 19 days is 8 hours a day.
8 h 27 min
On each working day: 8.44 h, or 76 h over 9 days
51 min
Banked each working day against a standard 7.6 h day (0.84 h)
26
Days off a year, one every fortnight (52 weeks ÷ 2)
Not set
Next day off
RDO accrual: time banked through the cycle
Each working day runs 51 min past a standard 7 h 36 min day. Across the 9 working days of the cycle that banks 7 h 36 min, one standard day, and that is the day off.
- Day 151 min
- Day 21 h 41 min
- Day 32 h 32 min
- Day 43 h 23 min
- Day 54 h 13 min
- Day 65 h 4 min
- Day 75 h 55 min
- Day 86 h 45 min
- Day 97 h 36 min
Your next twelve days off
Each day off falls on your chosen weekday in the last week of the cycle, then every fortnight after that.
Hours and dates only: this calculator divides the hours you enter and counts the calendar, and says nothing about pay. Your award or registered agreement decides whether RDOs accrue at all, how they accrue, and what happens when a day off lands on a public holiday. The dates above take no account of public holidays or leave. How accrual works under the construction award, and what the roster and timesheet should record, is in the guide to rostered days off.
FIFO & swing rosters
Turn a swing pattern into real dates, and see what it costs you in time at home.
FIFO roster calculator and swing calendar
The FIFO roster calculator turns a swing pattern and your first day on site into real on-swing and R&R dates, ready to download into your phone calendar. An 8/6 roster works out to 26 swings a year, about 209 days on site and 156 at home, and a 2/1 roster to about 17 swings, 243 days on and 122 at home.
How to calculate FIFO roster days per year
Add the days on to the days off to get the cycle length. Divide 365 by the cycle for swings per year. For days on site, multiply 365 by the days on and divide by the cycle; the rest of the year is days at home. The figures count calendar days only: travel days sit on whichever side your agreement puts them, the swing or the R&R.
Worked example. A 2/1 roster is 14 days on and 7 off, a 21-day cycle. 365 ÷ 21 is 17.4 swings a year, 365 × 14 ÷ 21 is 243.3, so about 243 days on site, and the other 122 days are at home.
Common FIFO roster patterns: days on site and days at home
| Pattern | Cycle | Swings a year | Days on site | Days at home |
|---|---|---|---|---|
| 2/114 on, 7 off | 21 days | 17.4 | 243 | 122 |
| 8/68 on, 6 off | 14 days | 26.1 | 209 | 156 |
| 3/121 on, 7 off | 28 days | 13.0 | 274 | 91 |
| 4/228 on, 14 off | 42 days | 8.7 | 243 | 122 |
| 2/2 (even time)14 on, 14 off | 28 days | 13.0 | 183 | 182 |
| 7/7 (even time)7 on, 7 off | 14 days | 26.1 | 183 | 182 |
| 4/44 on, 4 off | 8 days | 45.6 | 183 | 182 |
Swing patterns and travel are exactly what FIFO rostering software manages for whole crews, flights and camp nights included.
Swing roster comparison: days at home per year
Swing roster comparison puts two patterns side by side in days at home, days on site and full weekends off across a year. Weekends are averaged over every possible start day, because the weekday a swing starts on changes how many Saturdays and Sundays land in R&R.
Pattern A
Pattern B
| 14/7 | 8/6 | |
|---|---|---|
| Cycle length | 21 days | 14 days |
| Swings per year | 17.4 | 26.1 |
| Days on site per year | 243 | 209 |
| Days at home per year | 122 | 156 |
| Share of year at home | 33% | 43% |
| Full weekends at home per year | 14.6 | 18.6 |
Days at home: 8/6 wins by 34 days a year. Full weekends at home: 8/6 wins by 4 a year.
Weekend counts are averaged over every possible start day of the pattern; yearly figures use a 365-day year. Managing patterns for a whole crew, flights, camp and travel included, is covered in FIFO flights, accommodation and rostering.
FIFO roster calculator: common questions
What does the FIFO roster calculator do?
It turns a swing pattern and your first day on site into dated on-swing and R&R blocks, for up to 26 swings. It covers 2/1, 8/6, 3/1, even-time 7/7 and 14/14, and custom patterns of up to 60 days on or off, and it runs entirely in your browser.
How do you calculate days on site for a FIFO roster?
Multiply 365 by the days on, then divide by the cycle length, which is days on plus days off. A 2/1 roster is 14 on and 7 off, so 365 × 14 ÷ 21 gives about 243 days on site and 122 at home a year. Travel days come out of whichever side your agreement puts them on.
Which FIFO roster gives the most time at home?
Of the common patterns, even-time rosters give the most: about 182 days at home a year on either 7/7 or 14/14. An 8/6 gives about 156 days, a 2/1 or a 4/2 about 122, and a 3/1 about 91. A 14/14 has half as many swings as a 7/7, so half the travel for the same days at home.
Can I load the swing calendar into my phone?
Yes. The download is a standard .ics calendar file with each on-swing and R&R block as an all-day event. Apple Calendar and Outlook open it directly, and on Android it imports through Google Calendar on the web.
Does it work for DIDO and custom rosters?
Yes, for any roster that repeats as a fixed block of days on and days off, whether the crew flies, drives or buses in, so a 4/3 DIDO or a 10/4 goes in as a custom pattern. Rosters that change shape from swing to swing, or split days and nights inside a swing, need rostering software rather than a calculator.
Can I use it as a roster calculator for shifts that are not FIFO?
Yes. Enter a non-FIFO pattern such as 4 on 4 off or 5 on 2 off as a custom pattern and it returns the same dated calendar of on and off blocks. A 9-day fortnight or 19-day month has its own calculator on this page, and for round-the-clock rosters the crew coverage planner works out the headcount and crews the pattern needs.
Does the calculator include public holidays or travel days?
No. It counts calendar days only, so public holidays, travel days and flight times are not shown, and whether a travel day counts as work or R&R depends on your agreement. Humanz attaches travel days, flights and camp nights to the real roster for whole crews.
Cost calculators
What manual rostering and crew churn actually cost across a year.
No-show & roster admin cost calculator
What does the spreadsheet-and-phone-calls approach actually cost per year? Two inputs most field businesses know off the top of their head, two they can estimate.
$28,800
Lost to no-shows per year
$28,600
Roster admin cost per year
$57,400
Total annual cost of manual rostering
No-show cost = day rate × no-shows × 12, which understates the true impact (crew standing time, backfill premiums, client goodwill). Businesses moving to real-time rostering with confirmation tracking typically cut both numbers sharply, see how no-shows get prevented.
Field worker turnover cost calculator
Every departure means recruiting, re-inducting and weeks of reduced output while the replacement gets up to speed. Put an annual number on churn.
8
Departures per year
$12,500
Cost per departure
$100,000
Annual cost of turnover
Assumes a new starter runs at half output during ramp-up (ramp weeks × 5 days × day rate × 50%). Structured onboarding shortens the ramp, see how to onboard field workers and onboarding software for mining & construction.
Timesheet processing cost calculator
Every paper or emailed timesheet gets collected, chased, deciphered, approved and re-keyed, and a share of them arrive wrong. Put an annual figure on the whole pipeline.
13h
Admin hours spent on timesheets each week
$35,750
Annual processing cost
$14,040
Annual cost of fixing errors
$49,790
Total annual timesheet pipeline cost
Error-fix costs understate reality, they exclude back-pay remediation and dispute time. Roster-prefilled digital timesheets with a proper approval workflow collapse both numbers: submission is a tap, approval is a queue, and errors get caught at the source.
Payroll leakage calculator
When hours are written from memory at week's end, small roundings creep in, a 3:50 finish becomes 4:00, a long lunch doesn't. Nobody is stealing; the process is just soft. Here's what a few minutes a shift costs at crew scale.
$1,950
Leakage per worker per year
$78,000
Crew-wide leakage per year
$39,000
Still the cost if only half of it is real
The fix isn't surveillance, it's defaults. Roster-prefilled timesheets start from planned times so variances are deliberate, visible edits rather than memory, and the same clean data feeds payroll without re-keying.
Build your business case, ROI & payback
This tool reads live from the calculators above. Tune their inputs to match your operation, tick the cost streams that apply, add your platform budget, and get the numbers a business case needs.
Cost streams to include
$146,190
Annual cost of running manually
$146,190
Annual saving potential (add your quote above)
–
Payback period on the platform
$438,570
Three-year net position
Send this case to our team
We'll sanity-check your numbers against businesses like yours and reply with a tailored proposal, see how pricing works first if you like.
Every assumption is yours to edit and the leakage stream is counted at half by design, a conservative case survives scrutiny. Figures are estimates, not quotes; Humanz pricing is per business, explained on the pricing page.
Safety systems
Injury rates, toolbox talks and prestarts: the records tenders and inspectors ask for.
TRIFR and LTIFR calculator
Recordable injuries and lost time injuries per million hours worked, from your own injury counts and the hours the crew actually worked. Switch to the 200,000-hour basis for clients who report the US way.
No hours total yet? Estimate one
3.8
LTIFR: lost time injuries per million hours
22.6
TRIFR: recordable injuries per million hours
6
Recordable injuries counted
7.5
LTIFR if one more lost time injury happened
What counts as recordable. Fatalities, lost time injuries (at least one full shift lost after the day of injury), restricted work injuries (back at work on alternate or restricted duties) and medical treatment injuries (a doctor beyond first aid, no shift lost). First aid injuries are not recordable. A client's questionnaire may define the classes slightly differently, so use its definitions on its form. Why per million hours. Australia's injury recording standard, AS 1885.1, sets the frequency rate per million hours worked and tenders follow it. US OSHA rates use 200,000 hours, so the same year reads five times smaller on that basis. LTIFR vs TRIFR. LTIFR counts lost time injuries and fatalities only. TRIFR adds restricted work and medical treatment injuries, so it is always the same or higher. Benchmarks. Safe Work Australia publishes claims-based rates rather than TRIFR, and its national serious claims rate of 6.8 per million hours in 2023-24 counts accepted claims with a week or more off work, so it is not comparable with an injury-based rate. Compare against your own history on the same basis, and use a three to five year window if the crew is small. The worked example and the tender advice are in the TRIFR and LTIFR guide. Hours are the denominator, and approved digital timesheets are where the real figure lives. This page only does the arithmetic on what you type in. The Humanz app does not classify injuries or produce this rate from its own records; the counts are your safety team's.
Toolbox talk planner and prestart templates
Build a dated calendar of toolbox talk topics for your industry and the hazards on your site, with heat, storms and wet weather landing in the right months for your region. Each talk comes with three points and one question for the crew. Load it into your calendar or a spreadsheet, then print the record and prestart templates below.
Hazards on this site (each one adds its topics)
Printable templates
Three one-page records. Print straight from the page, or save as a PDF from the print dialog. They are starting points: add the questions your site, client or principal contractor asks for.
Toolbox talk record
Toolbox talk record
| Date | Time | Site / job | Presenter |
Topic:
Key points discussed (hazard, control, real example)
1.
2.
3.
Questions or concerns raised by the crew
Actions agreed
| Action | Who | By when | Done |
|---|---|---|---|
Attendees (name, company, signature)
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 |
Supervisor sign-off:
Open actions carry to the next talk. humanz.net.au/tools
Daily prestart meeting checklist
Daily prestart meeting checklist
| Date / shift | Site | Supervisor | Forecast (max temp, storms, wind) |
Since yesterday
Incidents, near misses, hazards reported:
Open actions from the last talk:
What has changed on site (ground, plant, access, other contractors):
Today
Tasks by area, and the hazards of each:
Permits needed today (hot work, confined space, excavation, heights, isolation):
Plant on site and prestart checks done:
Interfaces: other crews, public, live traffic, services:
Heat or weather plan for the day (water, shade, rescheduled tasks):
People
New starters, visitors, inductions outstanding:
Anyone working alone today, and their check-in arrangement:
Fit for work: everyone asked, anyone not right today:
Emergency
First aider today / kit and extinguisher locations / muster point / site address for 000:
Attendees (name, company, signature)
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 |
Supervisor sign-off:
humanz.net.au/tools
Plant prestart check
Plant prestart check
| Plant ID / rego | Operator | Licence / VOC | Date / shift | Hours / km |
Walk-around, engine off (tick or note a defect)
| Body damage | Leaks (oil, fuel, hydraulic, coolant) | Tyres or tracks | Fluid levels |
| Guards and covers | Steps, handrails, access | Mirrors and glass | Lights and beacons |
| Attachments and pins | Load restraint | Fire extinguisher | First aid kit |
Function checks, engine running
| Gauges and warning lights | Service and park brakes | Steering | Hydraulics and controls |
| Horn and reverse alarm | Seat belt | Emergency stop | Radio or comms |
Before operating
| Operator fit for work | Exclusion zone set | Ground and weather suitable | Spotter briefed |
Defects found and reported to:
Safe to operate: YES / NO (a NO means the plant is tagged out until repaired)
Operator signature:
Supervisor signature:
humanz.net.au/tools
Is a toolbox talk a legal requirement? Not by name. The model WHS laws require a business to consult workers on health and safety matters and to give information, training and instruction that is suitable, adequate and readily understandable, and regulators across the country name toolbox talks as one way to do both. No law sets a frequency or a length. The common pattern is a daily prestart and a weekly toolbox talk, five to ten minutes each, with a signed record. What to keep. Topic, date, presenter, who attended, what was raised, and the actions with a name and a date on each. Heat. There is no stop-work temperature in Australian WHS law; the duty is to manage the risk, starting with moving heavy work to cooler parts of the day. The full guide is toolbox talks and prestart meetings for field crews. In the Humanz app, your admin builds the talk record and the prestart as custom forms that crews complete on their phones, timestamped against the job; this page only builds the calendar and prints the templates.
These checks run automatically, for every worker on every shift, in Humanz.
Book a free demo
